Liebherr LTM 11200-9.1 - Ready for departure | 19. March 2018

After several weeks of installation of an E-82 with a hub of 108m height for our customer ENERCON in the wind farm Uedem on the Lower Rhine, our Liebherr LTM 11200-9.1 is ready for departure.

The telescopic boom of the LTM 11200-9.1 is transported separately from the basic unit on an 8-axle trailer with a 4-axle tractor unit.

Due to the overload of the authorities, there are unfortunately still considerable delays in the consultation procedures for granting transport Permits.

The responsible crane operators Thomas Sommer and Kevin Hellbach are now waiting to transfer "their" ready to go LTM 11200-9.1, the largest telescopic crane in the world, to the KVN site in Osnabrück for minor inspection works and a safety check.